  "edition": "2026-10-01-capital-deployment",
  "reviewed": "2026-10-01",
  "purpose": "Trace the two $600m ATM programs to disclosed financing, business plans, cash uses and project commitments without inventing an allocation.",
  "conclusion": "$1.2bn is the sum of the May and August program ceilings. Approximately $599.014m gross May-program sales are documented; August-program execution is unknown in the reviewed record. Neither prospectus provides a line-item dollar allocation.",
  "programs": [
    {
      "id": "may-2026",
      "authorizedGrossUSD": 600000000,
      "documentedGrossUSD": 599014000,
      "documentedGrossApproximate": true,
      "h1GrossUSD": 549814000,
      "postJuneGrossUSD": 49200000,
      "documentedShares": 3277525,
      "h1NetAfterAgentUSD": 538817000,
      "totalNetUSD": null,
      "projectAllocations": null,
      "refs": [
        "Q",
        "ATM_MAY",
        "A"
      ]
    },
    {
      "id": "august-2026",
      "authorizedGrossUSD": 600000000,
      "documentedGrossUSD": null,
      "documentedShares": null,
      "totalNetUSD": null,
      "projectAllocations": null,
      "refs": [
        "A",
        "ATM_AUG8K"
      ]
    }
  ],
  "financingScope": "An earlier February/March program raised $500m gross. Combined documented 2026 ATM sales are ~$1.099014bn gross. H1 cash flows include financing and spending before May; they are not a two-program allocation.",
  "h1CashBridge": {
    "period": "Six months ended June 30, 2026",
    "unit": "USD millions",
    "refs": [
      "Q"
    ],
    "openingCashIncludingRestricted": 216.035,
    "commonStockNetProceeds": 1028.207,
    "operatingCashFlow": -73.781,
    "ppePurchases": -335.132,
    "equipmentAndOtherPrepayments": -289.744,
    "landPurchases": -8.581,
    "intangiblePurchases": -0.259,
    "equipmentDisposals": 0.003,
    "investingCashFlow": -633.713,
    "employeeAwardTaxWithholding": -71.163,
    "otherFinancing": {
      "notesAndLongTermDebt": 1.653,
      "creditLineProceeds": 46.906,
      "creditLineRepayments": -24.733,
      "changesInADPI": 0.08,
      "bankAcceptanceProceeds": 68.639,
      "bankAcceptanceRepayments": -69.215,
      "convertibleNotePayments": -0.095
    },
    "netOtherFinancing": 23.235,
    "netFinancing": 980.279,
    "foreignExchange": 19.938,
    "closingCashIncludingRestricted": 508.758,
    "closingUnrestrictedCash": 499.737,
    "closingRestrictedCash": 9.021,
    "workingCapitalComponents": {
      "receivables": -69.649,
      "inventory": -94.092,
      "otherCurrentAssets": -56.009,
      "payables": 142.156,
      "note": "Components inside operating cash flow, not additional uses to sum with operating cash flow."
    },
    "ppeGeography": {
      "US": 169,
      "Taiwan": 62.8,
      "China": 103.3,
      "roundingResidual": 0.032,
      "note": "Rounded country figures; these partition $335.132m PP&E cash purchases only. Equipment/other prepayments are a separate cash-flow line with no disclosed country split."
    }
  },
  "projects": [
    {
      "id": "sugar-land-plan",
      "name": "Sugar Land expansion plan",
      "amount": 150000000,
      "currency": "USD",
      "basis": "announced investment greater than this amount",
      "status": "plan envelope",
      "date": "2025-10-28",
      "refs": [
        "SUGAR_LAND_PLAN"
      ],
      "detail": "New ~210,000-sq-ft transceiver facility plus a line at existing headquarters; >500 jobs over five years. No dollar split for lasers vs modules, tools vs property, or each ATM.",
      "overlap": "Broad plan may overlap reported PP&E, equipment advances and local construction budgets; do not add as a separate current cash use.",
      "atmProgramAllocation": null
    },
    {
      "id": "gillingham-rent",
      "name": "Gillingham / Fab 2",
      "amount": 18500000,
      "currency": "USD",
      "basis": "approximate undiscounted base lease payments over initial term",
      "status": "multi-year rent",
      "date": "2026-06-30",
      "refs": [
        "Q"
      ],
      "detail": "209,665 sq ft; 126 months from March 31, 2026; seven months base-rent abatement. $1,886,985 maximum landlord improvement allowance is not company cash spending.",
      "overlap": "Rent is paid over time; lease liability and ROU asset are not extra upfront cash outflows. Separate fit-out/equipment may be in the broad Sugar Land plan.",
      "atmProgramAllocation": null
    },
    {
      "id": "pearland-property",
      "name": "Pearland / Kirby campus purchase",
      "amount": 58428612,
      "currency": "USD",
      "basis": "contract purchase price",
      "status": "signed purchase agreement",
      "date": "2026-04-07",
      "refs": [
        "PEARLAND_PURCHASE",
        "PEARLAND"
      ],
      "detail": "388,133 sq ft at 14621 Kirby and 11555 North Spectrum. $1,168,512 deposit is part of transaction mechanics. April 13 filing scheduled April 17 closing; July announcement describes the acquired campus.",
      "overlap": "Do not add the deposit again. Do not add the property price on top of H1 investing without a transaction-to-cash-flow reconciliation.",
      "atmProgramAllocation": null
    },
    {
      "id": "pearland-build",
      "name": "Pearland OMD 3 / Fab 4 cleanroom",
      "amount": 94100000,
      "currency": "USD",
      "basis": "approximate design-build contract amount",
      "status": "contract / progress payments",
      "date": "2026-06-25",
      "refs": [
        "PEARLAND_BUILD"
      ],
      "detail": "195,591 sq ft cleanroom + 36,500 office + 73,780 support space. Design, engineering, procurement, construction, testing and commissioning; monthly pay applications, 10% retainage. Target substantial completion January 10, 2027. Paid-to-date and remaining unpaid amount not separately disclosed in the reviewed summary.",
      "overlap": "Not an additional $94.1m of verified cash spent; progress payments can overlap aggregate PP&E/prepayments. Not the same scope as an earlier state construction estimate.",
      "atmProgramAllocation": null
    },
    {
      "id": "pearland-incentives",
      "name": "Pearland contractor incentives",
      "amount": 15800000,
      "currency": "USD",
      "basis": "arithmetic sum of separately stated maximum incentive categories",
      "status": "conditional maxima / no payout assumed",
      "date": "2026-06-25",
      "refs": [
        "PEARLAND_BUILD"
      ],
      "detail": "Up to $6m schedule + $4.9m cleanroom validation + $4.9m warranty incentives, each subject to contract terms. Separately, delay liquidated damages capped at $4.9m.",
      "overlap": "Do not assume all incentives will be earned or automatically add them to the $94.1m contract. Do not net hypothetical damages against the contract.",
      "atmProgramAllocation": null
    },
    {
      "id": "blue-ridge-purchase",
      "name": "Blue Ridge Building 3 purchase",
      "amount": 26783472,
      "currency": "USD",
      "basis": "purchase price paid in cash, subject to closing adjustments",
      "status": "completed cash purchase",
      "date": "2026-09-04",
      "refs": [
        "H"
      ],
      "detail": "Previously leased 153,928-sq-ft building at 16851 Blue Ridge Commerce Drive. Purchased with cash at September 4 closing.",
      "overlap": "Separate from Hightower Buildings 1–3. Do not also treat the earlier entire Blue Ridge lease obligation as a current cash use after this purchase.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-i-option",
      "name": "Hightower Phase I Buildings 1–3",
      "amount": 102250000,
      "currency": "USD",
      "basis": "aggregate property purchase option price",
      "status": "purchase option / closing unverified",
      "date": "2026-05-08",
      "refs": [
        "HIGHTOWER_I",
        "Q",
        "L"
      ],
      "detail": "736,216 sq ft. $1,758,750 earnest money is transaction mechanics, not an extra purchase price. Phase II landlord may terminate if Phase I options are not exercised/closed as specified.",
      "overlap": "Option price is not current cash spent. Do not sum full future lease rent and purchase prices as though both are unconditional obligations.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-i-rent",
      "name": "Hightower Phase I starting rent",
      "amount": 464124.96,
      "currency": "USD",
      "basis": "combined monthly base rent from lease month four",
      "status": "future rent / escalates",
      "date": "2026-05-08",
      "refs": [
        "HIGHTOWER_I"
      ],
      "detail": "$104,915.20 Building 1 + $6,680 adjacent land + $205,999.20 Building 2 + $146,530.56 Building 3; 123-month terms. No commencement at June 30 in the 10-Q.",
      "overlap": "Periodic rent; may be affected by purchase. Not a one-time capital allocation.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-ii-deposit",
      "name": "Hightower Phase II security deposits",
      "amount": 11300000,
      "currency": "USD",
      "basis": "aggregate contractual deposits",
      "status": "staged contractual cash requirement",
      "date": "2026-08-31",
      "refs": [
        "L"
      ],
      "detail": "$750,000 due at execution; $10.55m due within 10 days after applicable commencement. Subject to conditions, reductions after three years can be applied to rent, leaving $750,000.",
      "overlap": "Deposit is not expense or building cost. Avoid counting later deposit-to-rent application as another cash payment. Due amounts are not independently verified bank transfers.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-ii-steel",
      "name": "Hightower Phase II roof / steel modifications",
      "amount": 2550000,
      "currency": "USD",
      "basis": "approximate tenant-funded changes",
      "status": "due at lease execution",
      "date": "2026-08-31",
      "refs": [
        "L"
      ],
      "detail": "Structural steel designed to accommodate possible future rooftop solar; actual change-order reconciliation applies. Base building construction is generally funded by the landlord.",
      "overlap": "Do not label all landlord construction cost as an AAOI upfront cash use. Modifications and optional purchase price are different statuses.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-ii-rent",
      "name": "Hightower Phase II initial base rent",
      "amount": 678160.34,
      "currency": "USD",
      "basis": "combined monthly base rent in lease months 1–12",
      "status": "first installment due at execution; subsequent rent at lease start",
      "date": "2026-08-31",
      "refs": [
        "L"
      ],
      "detail": "$220,835.32 Building 4 + $457,325.02 Building 5; annualizes to $8,137,924.08 before escalations, operating costs, taxes and insurance. 120-month terms; expected construction ~16 months after August 31.",
      "overlap": "Annualized first-year rate is not an additional lump-sum cost. Expected late-2027 delivery is a contract estimate, not verified completion.",
      "atmProgramAllocation": null
    },
    {
      "id": "hightower-ii-option",
      "name": "Hightower Phase II Buildings 4–5",
      "amount": 146570138,
      "currency": "USD",
      "basis": "combined optional property purchase price",
      "status": "purchase option / future decision",
      "date": "2026-08-31",
      "refs": [
        "L"
      ],
      "detail": "1,093,807 sq ft; price adjusts at $134/sq ft for specified remeasurement, aggregate upward adjustment capped at 1%. $2m earnest-money provision; closing terms depend on option exercise.",
      "overlap": "Do not double the $2m provision because it appears in both leases for a single purchase transaction. Option price is not current cash spent.",
      "atmProgramAllocation": null
    },
    {
      "id": "ningbo-rent",
      "name": "Ningbo additional factory",
      "amount": 6896124,
      "currency": "CNY",
      "basis": "annual base rent",
      "status": "10-year lease / escalating rent",
      "date": "2026-09-10",
      "refs": [
        "N"
      ],
      "detail": "38,311.8 sq m; September 16, 2026 start; three-month renovation rent holiday; 3% increases every three years beginning year three. Production fit-out is at tenant expense, budget not specified.",
      "overlap": "No undated FX conversion. Rent is recurring, not a one-time USD capex line; fit-out budget is unknown.",
      "atmProgramAllocation": null
    },
    {
      "id": "production-tools",
      "name": "Lasers, transceiver assembly, test and automation",
      "amount": null,
      "currency": "USD",
      "basis": "project-level budget not disclosed",
      "status": "strategic investment priority",
      "date": "2026-08-06",
      "refs": [
        "Q",
        "T",
        "SUGAR_LAND_BLOG"
      ],
      "detail": "US and Taiwan expansion supports laser diodes, 800G and 1.6T; 10-Q also cites China, 400G and Quantum Bandwidth products. August call describes long-lead buildings/equipment for 2027–28 customer ramps and expects higher H2 capex intensity.",
      "overlap": "Tools and supplier advances sit inside consolidated cash-flow categories. No disclosed dollars per product, customer, facility or ATM program.",
      "atmProgramAllocation": null
    },
    {
      "id": "working-capital",
      "name": "Working capital, hiring, ramp costs and R&D",
      "amount": null,
      "currency": "USD",
      "basis": "no program-specific budget",
      "status": "permitted use / ongoing operations",
      "date": "2026-08-21",
      "refs": [
        "ATM_MAY",
        "A",
        "Q"
      ],
      "detail": "Inventory, receivables and operating costs must be financed before collection. H1 $73.781m net operating cash use; R&D expense $60.527m is an accrual expense, not an extra cash use to add.",
      "overlap": "Use the cash-flow statement for cash spending; do not add expense lines or balance-sheet changes again.",
      "atmProgramAllocation": null
    },
    {
      "id": "debt",
      "name": "Debt repayment",
      "amount": null,
      "currency": "USD",
      "basis": "no ATM-specific payoff amount or schedule",
      "status": "permitted use",
      "date": "2026-08-21",
      "refs": [
        "ATM_MAY",
        "A",
        "Q"
      ],
      "detail": "Debt repayment is authorized in both prospectuses. H1 cash-flow statement shows gross repayments and fresh borrowings; no earmarked payoff of the convertible notes is disclosed.",
      "overlap": "Debt repayments are already in the financing cash bridge; do not add gross debt balances as if paid.",
      "atmProgramAllocation": null
    },
    {
      "id": "acquisitions",
      "name": "Potential business / technology / product acquisitions",
      "amount": null,
      "currency": "USD",
      "basis": "no allocated amount",
      "status": "permitted use; no present plans stated",
      "date": "2026-08-21",
      "refs": [
        "ATM_MAY",
        "A"
      ],
      "detail": "Both prospectuses state no present plans, agreements or commitments for a potential acquisition as of their dates.",
      "overlap": "Do not infer an undisclosed M&A target or confuse ordinary factory-property purchases with an announced business acquisition.",
      "atmProgramAllocation": null
    },
    {
      "id": "liquidity",
      "name": "Liquidity pending deployment",
      "amount": null,
      "currency": "USD",
      "basis": "no October 1 cash balance disclosed",
      "status": "permitted temporary holding",
      "date": "2026-08-21",
      "refs": [
        "ATM_MAY",
        "A",
        "Q"
      ],
      "detail": "Cash or investment-grade interest-bearing instruments permitted pending use. June 30 unrestricted cash was $499.737m, plus $9.021m restricted.",
      "overlap": "June cash predates August ATM; it is not the unspent balance of the two $600m programs.",
      "atmProgramAllocation": null
    }
  ],
  "totalsPolicy": "No grand total across projects: dates, statuses and currencies differ, and several rows overlap aggregate cash flows or broader plans. No percent of $1.2bn allocated or unexplained residual is fabricated.",
  "unresolved": [
    "Actual sales and net proceeds under the August 21 ATM",
    "May post-June net proceeds and exact remaining May capacity",
    "Per-facility and per-product equipment budgets",
    "Paid-to-date / remaining amounts on the Fab 4 contract",
    "Hightower Phase I purchase exercise and closing status",
    "Project-to-ATM fund tracing and the current cash balance",
    "Customer qualification, accepted output, utilization and cash returns per diluted share"
  ],
  "primaryDownloads": [
    {
      "id": "MAY",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000110465926061146/tm2614157-1_424b5.htm",
      "retrieved": "2026-10-01",
      "sha256": "715a0380f64f4dedd0e293aed11c992a1a0ec69b4df510bb01fb5ae51c396c8a"
    },
    {
      "id": "AUG",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000110465926099685/tm2623389-1_424b5.htm",
      "retrieved": "2026-10-01",
      "sha256": "594a40897db217057f722b0372812c8adaad125bd0778f571db570829168b70c"
    },
    {
      "id": "Q",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000143774926026278/aaoi20260630_10q.htm",
      "retrieved": "2026-10-01",
      "sha256": "7bc16d71f25dcce7d7a871d37428c82ad4c4c090b8cabbe6ca6ce3bae7cb88d7"
    },
    {
      "id": "PEARLAND_PURCHASE",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826002858/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "159e2332154ef208cbb35de1215c65bfc5ec27810ee94bbc2e073c2a506cd365"
    },
    {
      "id": "PHASE_I",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826003572/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "95f61ed712e6d06410271778b78e5d4455199d6e07192ae630f8ba9f97307d8b"
    },
    {
      "id": "MAY13",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826003817/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "6196a66611439ee8b81398023cf47c77ed197e4ebacc465bf4159ad65cba142a"
    },
    {
      "id": "JUNE5",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826004596/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "3de24b522ace6de069a356ad4849ddf3923046e2c3a887deb444b73cc89a0181"
    },
    {
      "id": "JUNE16",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826004885/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "80c5b15820c3c09a009d70a0f921dc8d7fb0da6c1b19f5cfa733aab8973cc92f"
    },
    {
      "id": "PEARLAND_BUILD",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826005221/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "9d6cde8e4085f19ba3326cca356690aa2735e6d6edf4c3ae088d98c71136200d"
    },
    {
      "id": "PHASE_II",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826006862/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "bf3d9b16982bfe3b10e2183894784b238a9b2c927a5eaa7cb8aafbf488514bcb"
    },
    {
      "id": "SEPT_PURCHASE",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826007057/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "3164bf6c7a3f18ba747cd773dcc71a5f95e9b09bcb3285e1a4a4464e164d212a"
    },
    {
      "id": "NINGBO",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826007160/aaoi_8k.htm",
      "retrieved": "2026-10-01",
      "sha256": "4945bd94dd82066afd04c21d2cf0f853c61ee9209dd59e73e63bb7c2109a7116"
    }
  ],
  "sources": {
    "Q": {
      "label": "SEC Q2 10-Q · Aug 6",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000143774926026278/aaoi20260630_10q.htm",
      "published": "2026-08-06",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Statements pp.4–8; manufacturing overview Note1; revenue geography Note17; ATM sales table MD&A p.29; liquidity pp.29–31."
    },
    "ATM_MAY": {
      "label": "SEC second 2026 ATM · May 14",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000110465926061146/tm2614157-1_424b5.htm",
      "type": "primary",
      "accessed": "2026-10-01",
      "published": "2026-05-14",
      "locator": "Use of Proceeds, S-9: capex, working capital, debt repayment and potential acquisitions; no specific allocations, no present acquisition plans/agreements/commitments; cash or investment-grade temporary investments."
    },
    "A": {
      "label": "SEC ATM prospectus · Aug 21",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000110465926099685/tm2623389-1_424b5.htm",
      "published": "2026-08-21",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "S-11: 332,428 shares / ~$49.2m gross sold after June 30 under May EDA; separate new $600m authorization. Use of Proceeds, S-10: same broad categories as May; no project-by-project earmarks or current acquisition plan."
    },
    "ATM_AUG8K": {
      "label": "SEC new $600m EDA · Aug 21",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000110465926099688/tm2623389d2_8k.htm",
      "type": "primary",
      "accessed": "2026-09-29",
      "published": "2026-08-21"
    },
    "T": {
      "label": "Q2 call: FMP/UW transcript, official replay",
      "url": "https://edge.media-server.com/mmc/p/fdq5dksv",
      "published": "2026-08-06",
      "accessed": "2026-10-01",
      "type": "management transcript",
      "locator": "August 6 prepared remarks and Q&A. Fresh FMP and UW transcript copies are byte-identical and are not independent transcription checks. Official replay is linked; audio not independently transcribed."
    },
    "SUGAR_LAND_PLAN": {
      "label": "AOI / Sugar Land expansion plan · Oct 28, 2025",
      "url": "https://newsroom.ao-inc.com/news-releases/aoi-announces-expansion-in-the-city-of-sugar-land/",
      "published": "2025-10-28",
      "accessed": "2026-10-01",
      "type": "company / city announcement",
      "locator": "210,000-sq-ft transceiver facility, new line at existing headquarters, over $150m planned investment, over 500 planned jobs in five years and $2m city incentive. Original summer-2026 target is historical, not proof of completion."
    },
    "SUGAR_LAND_BLOG": {
      "label": "AOI: why expand in Sugar Land? · company blog",
      "url": "https://newsroom.ao-inc.com/blog/building-the-future-of-ai-infrastructurewhy-aoi-is-expanding-in-sugar-land-tx/",
      "published": null,
      "accessed": "2026-10-01",
      "type": "company commentary",
      "locator": "Undated article; AI-transceiver onshoring, internally developed automation and shared 800G/1.6T line. Exterior image labeled AOI Office; image capture date not supplied."
    },
    "PEARLAND": {
      "label": "AOI Pearland expansion announcement",
      "url": "https://investors.ao-inc.com/news-releases/news-release-details/aoi-begins-expansion-pearland-manufacturing-campus-scale-800g",
      "published": "2026-07-14",
      "accessed": "2026-09-29",
      "type": "company announcement"
    },
    "PEARLAND_PURCHASE": {
      "label": "SEC Pearland purchase · Apr 13",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826002858/aaoi_8k.htm",
      "published": "2026-04-13",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Item 1.01: $58,428,612 purchase agreement; 388,133 sq ft; deposit is part of purchase mechanics. Signing disclosure, not a closing cash-flow receipt."
    },
    "PEARLAND_BUILD": {
      "label": "SEC Fab 4 construction · Jul 1",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826005221/aaoi_8k.htm",
      "published": "2026-07-01",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Item 1.01: ~$94.1m design-build contract; 195,591 sq ft of ISO Class 6 cleanroom; monthly progress payments, 10% retainage, conditional incentives; January 10, 2027 target."
    },
    "HIGHTOWER_I": {
      "label": "SEC Hightower Phase I · May 13",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826003817/aaoi_8k.htm",
      "published": "2026-05-13",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "May 8 leases, Buildings 1–3: 736,216 sq ft, $102.25m purchase options; separate $1.75875m earnest-money mechanics. No exercise or closing established by this filing."
    },
    "H": {
      "label": "SEC purchase · Sep 10",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826007057/aaoi_8k.htm",
      "published": "2026-09-10",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Item 1.01: Blue Ridge Building 3, 16851 Blue Ridge Commerce Dr.; 153,928 sq ft; $26,783,472 purchase price paid in cash September 4. This is not a Hightower Phase I building."
    },
    "L": {
      "label": "SEC Houston lease · Sep 1",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826006862/aaoi_8k.htm",
      "published": "2026-09-01",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Item 1.01: landlord-funded base buildings; $11.3m deposits, ~$2.55m steel modifications, first month rent payable at execution; $146.570138m optional purchase; delivery expected ~16 months after August 31. Phase I purchase condition creates a termination risk."
    },
    "N": {
      "label": "SEC Ningbo lease · Sep 15",
      "url": "https://www.sec.gov/Archives/edgar/data/1158114/000168316826007160/aaoi_8k.htm",
      "published": "2026-09-15",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "Item 1.01: 38,311.8 sq m; 10-year lease beginning September 16; RMB 6,896,124 annual base rent, three-month renovation holiday, 3% increases every three years starting year three; fit-out at tenant expense."
    },
    "SEC": {
      "label": "SEC filing history",
      "url": "https://www.sec.gov/edgar/browse/?CIK=1158114&owner=exclude",
      "accessed": "2026-10-01",
      "type": "primary",
      "locator": "SEC submissions API downloaded October 1: latest listed filing September 17 Form 4; latest quarterly report June 30 10-Q, filed August 6. No subsequent August ATM execution disclosure identified in this reviewed record."
    }
  }
}